Research - Final Reports
The following titles link to Summaries of pmd *CRC Stage One Final reports. A link to complete Final Reports is located at the end of each summary.
All reports currently available can be found here.
Architecture
Architecture A1 Project: What are the fundamental characteristics of mineralised (trans-lithospheric) fault systems?
Project A3 - Geophysical signatures of Architecture and Alteration
Fluids
Project F1-2: Fluid processes and geochemical modelling
Project F3: Micrometallogeny of Hydrothermal Fluids
History
Project H4: 40Ar/39Ar Dating of Mineralisation, Metamorphism and Deformation
Project H6: 40Ar/39Ar geochronology and halogen/noble gas geochemistry of mineralising systems
Modelling
Project M9 - Numerical modelling technology developments
Terrains
Project I1: Western Succession Basin Architecture and Ore Systems
Project I2+3: Total Systems Analysis of the Mt Isa Eastern Succession
Project I7: Multiscale analysis Mt Isa region and its metallogenic potential
Project T1: Targeting new mineral deposits in western Victoria
Project T5: Crustal Architecture, 3D Geological Map and Mineralisation in the Tasmanides of Eastern Australia (New South Wales and Victoria)
Project Y2: 3D geological models of the eastern Yilgarn Craton
Project Y3: Camp to Deposit-Scale Alteration Footprints in the Kalgoorlie-Kambalda Area
Project Y4: Concepts to targets: a scale integrated mineral systems study of the Eastern Yilgarn Craton
Industy One on One Projects
Project G14 - Architecture and Alteration - developing predictive tools for mineralisation in the Termite Range Fault corridor - Zinifex Limited
Project G15 - Sunrise Dam Gold Mine - AngloGold Ashanti Aust Ltd
