Research - Final Reports

The following titles link to Summaries of pmd *CRC Stage One Final reports. A link to complete Final Reports is located at the end of each summary.

All reports currently available can be found here.

Architecture
Architecture A1 Project: What are the fundamental characteristics of mineralised (trans-lithospheric) fault systems?
Project A3 - Geophysical signatures of Architecture and Alteration

Fluids
Project F1-2: Fluid processes and geochemical modelling
Project F3: Micrometallogeny of Hydrothermal Fluids

History
Project H4: 40Ar/39Ar Dating of Mineralisation, Metamorphism and Deformation
Project H6: 40Ar/39Ar geochronology and halogen/noble gas geochemistry of mineralising systems

Modelling
Project M9 - Numerical modelling technology developments

Terrains
Project I1: Western Succession Basin Architecture and Ore Systems
Project I2+3: Total Systems Analysis of the Mt Isa Eastern Succession
Project I7: Multiscale analysis Mt Isa region and its metallogenic potential

Project T1: Targeting new mineral deposits in western Victoria
Project T5: Crustal Architecture, 3D Geological Map and Mineralisation in the Tasmanides of Eastern Australia (New South Wales and Victoria)

Project Y2: 3D geological models of the eastern Yilgarn Craton
Project Y3: Camp to Deposit-Scale Alteration Footprints in the  Kalgoorlie-Kambalda Area
Project Y4: Concepts to targets: a scale integrated mineral systems study of the Eastern Yilgarn Craton

Industy One on One Projects
Project G14 - Architecture and Alteration - developing predictive tools for mineralisation in the Termite Range Fault corridor - Zinifex Limited
Project G15 - Sunrise Dam Gold Mine - AngloGold Ashanti Aust Ltd

Logos of core participants
Monash University University of Western Australia University of Melbourne James Cook University Geoscience Australia Victorian Institute of Earth and Planetary Sciences CSIRO Centre for Exploration Targeting AMIRA